News

Bathroom decoration waterproofing project


Post time: Dec-08-2023
toilet and (8)
https://www.sunriseceramicgroup.com/luxury-pan-dual-flush-toilet-product/
https://www.sunriseceramicgroup.com/siphonic-one-piece-white-ceramic-toilet-product/
9905A (6)_PicCopilot_c91b2

product feature

https://www.sunriseceramicgroup.com/products/

OUR BUSINESS

The mainly export countries

The product export to all of the world
Europe, USA, Middle-East
Korea, Africa, Australia

https://www.sunriseceramicgroup.com/products/

product process

https://www.sunriseceramicgroup.com/products/
检测实验

FAQ

1. What's the production capacity of production line?

1800 sets for toilet and basins per day.

2. What is your terms of payment?

T/T 30% as deposit,and 70% before delivery.

We will show you the photos of the products and packages before you pay the balance.

3. What package/packing do you provide?

We accept OEM for our customer, the package can be designed for customers' willing.
Strong 5 layers carton filled with foam, standard export packing for shipping requirement.

4. Do you provide OEM or ODM service?

Yes,we can do OEM with your own logo design printed on the product or carton.
For ODM,our requirement is 200 pcs per month per model.

5.  What are your terms for being your sole agent or distributor?

We would require a minimum order quantity for 3*40HQ - 5*40HQ containers per month.

1. Base treatment generally involves carefully cleaning the base surface to remove floating dust, and remove cement agglomerates and loose base layers; special treatment is required for pipe roots, drainage holes, yin and yang corners, and holes left after wall water and electricity renovations. It should be applied in an arc shape (or V-shape);

 

2. Before construction, you need to know how to mix the waterproof coating and what the mixing ratio is. If it is not mixed according to the proportion, the prepared waterproof coating may not achieve the original effect;

 

3. Application method: When applying waterproof paint, apply from bottom to top, first on the wall and then on the floor. The best time between the first and second coats is about 4-8 hours. The second coat should be applied on the premise that the waterproof layer applied in the previous coat is not sticky to the hand, and the two coats should be applied in a criss-cross pattern;
Key waterproof parts in bathroom:

Floor drains, the connection between small water pipes and floor slabs, and toilet bowl pipes are often the places where water leaks are most likely to occur in bathrooms. During construction, it is necessary to focus on these parts. Generally, other parts are brushed twice, but here they need to be brushed multiple times. In addition, more leakage occurs under the door stone. During construction, a zone must be made in advance under the door stone, and the waterproofing must be rolled up above the zone, so as to form a basin shape and form the function of storing and retaining water.

The company mainly undertakes hotel sanitary ware engineering orders, trade import and export, and provides OEM supplies for online e-commerce and physical stores, providing our customers with one-stop full-service services. The company will adhere to the precise positioning of quality first, customer first, considerate service and reasonable price, and strive to realize the vision of making smart life benefit the general public!

Online Inuiry